chesterfield camp

chesterfield camp

Thursday, 6 August 2015

Sunday, 2 August 2015

Taken from Eckington road bridge looking down at the winding hole.
 To be dug out.
 This is where we will be laying concrete blocks.



 making shuttering for lock side


 digging a hole
 more shuttering
 kite making


 visit to Hargreaves lock gate maker










 mixer Queens
 mixing team

 Roger
 shuttering on top of lock side
 laying first course 
 Andy block cutting


 End of camp photo  thanks everyone
 week two Sunday lots of concrete blocks laid
 Will laying concrete blocks
 Ruby and Jo pointing

 more block laying
Matt at end of day finely laying a level block well done